Expression of Interest (EOI) Office Partitioning Works at Golden Plaza Building - 2nd FloorIntroduction
The Deutsche Gesellschaft fĂĽr Internationale Zusammenarbeit (GIZ) GmbH is a federally owned international cooperation enterprise for sustainable development with worldwide operations. GIZ has worked in Rwanda for over 30 years. The primary objectives between the Government of Rwanda and the Federal Republic of Germany are poverty reduction and promotion of sustainable development. To achieve these objectives, GIZ Rwanda is active in the sectors of Decentralization and Good Governance, Economic Development and Employment Promotion, Energy, and ICT (Information and Communications Technology), Natural Resources, Peace and Security and Sexual and gender-based violence (SGBV).
context:The GIZ in Rwanda is creating a new Cluster “Climate, Energy and Urban Development” and the projects which are part of the Cluster are settling into a new office building to accommodate the growing number of staff and to provide them with a modern workspace in a conducive environment. The overall office space consists of roughly 460 sqm. So far, the floor is an open space and not partitioned. The floor has to be converted into separate offices, meeting rooms, and common area spaces and has to be adapted to the needs of the GIZ programmes, their management, and staff.
The new office space has to create and provide a conducive environment for teamwork, while including sufficient individual space for specific tasks, space for fostering easy exchange between staff, an inviting atmosphere for meetings with partners and visitors, a layout that guarantees daylight in all offices, meeting rooms and common areas, despite all partitions.
Description of assignment:As mentioned above, the space rented in Golden Plaza Building consists of roughly 460 sqm. Currently, the office space is an open space with separate toilets. Architectural plans on how to refurbish the open space have been drawn up. The open space shall be separated by partitions into various smaller spaces/offices. There will be separated offices for the Cluster manager, the executive assistant and cluster portfolio management, an open-floor administrative & finance pool, and four main project offices for the management and technical staff of each project of the cluster. There will be also a reception and waiting area, a large meeting room, three small meeting rooms, a kitchenette including dining space. The materials to be used for those partitions vary from gypsum partitions to glazed partitions and some baked brick exposed masonry.
Tasks to be performed by the contractor
Under the supervision of the architect Jean Marc Rossignol and the project director of the projects cluster, the contractor will be expected to undertake the partitioning of the following space (details of the works are provided in the drawings layouts and bill of quantities of the project):
Similar Jobs in RwandaLearn more about GIZ RwandaGIZ Rwanda jobs in Rwanda
Reception and waiting area:The reception and waiting area of the project cluster office will be accessible for different people visiting the office. This area will have small lobby area including one sofa for people to sit.
• A 3.40 m high soundproof gypsum partition and baked brick wall shall separate the reception and waiting area from the admin staff space
• The reception and waiting area shall be re-painted. The colours to be used in this space shall be agreed upon between the contractor and GIZ
Project offices space:• This includes four separate office spaces. Each offices space will include a space for the staff and an office for the director of each project. Project offices will be separate from each other by soundproof gypsum partition up to the ceiling. The offices will be served by a corridor; the corridor and the offices are separated by laminated glazed aluminium frame partition including gypsum board at the top, up to the ceiling.
• In the glazed partition glass doors shall be installed.
• The new gypsum partition shall be painted and existing wall shall be re-painted. The colours to be used in this space shall be agreed upon between the contractor and GIZ
Offices for Cluster manager, the executive assistant and cluster portfolio management, and administration:
• The office space for Cluster manager, the executive assistant and cluster portfolio management, and administration for administration shall be separated by soundproof gypsum partition up to the ceiling
• They shall be separated from the corridor by laminated glazed aluminium frame partition including gypsum board at the top up to the ceiling.
• In the glazed partition glass doors shall be installed.
• The new gypsum partition shall be painted and existing wall shall be re-painted. The colours to be used in this space shall be agreed upon between the contractor and GIZ
Rooms for small projects and visiting/temporary staff:• Two rooms for small projects and visiting/temporary staff shall be separated from administrative and finance pool office by soundproof gypsum partition up to the ceiling
• They shall be separated from the corridor and from each other, by laminated glazed aluminium frame partition including gypsum board at the top, up to the ceiling.
• In the glazed partition glass doors shall be installed.
• The new gypsum partition shall be painted and existing wall shall be re-painted. The colours to be used in this space shall be agreed upon between the contractor and GIZ
Large Meeting room: • The meeting room shall be separated from the corridor by laminated glazed aluminium frame partition including gypsum board at the top, up to the ceiling.
• In the glazed partition glass doors shall be installed.
• The new gypsum partition shall be painted, and existing wall shall be re-painted. The colours to be used in this space shall be agreed upon between the contractor and GIZ
Small Meeting rooms: • The project includes three small meeting rooms. Each small meeting room shall be separated from the corridor by laminated glazed aluminium frame partition including gypsum board at the top, up to the ceiling.
• In the glazed partition glass doors shall be installed.
• The new gypsum partition shall be painted, and existing wall shall be re-painted. The colours to be used in this space shall be agreed upon between the contractor and GIZ.
Kitchen space:• The kitchen space shall be separated from the from administrative and finance pool office by soundproof gypsum partition up to the ceiling
• A sink shall be installed in the kitchen space.
• Water supply as well as wastewater drainage from the sink shall be installed.
• The kitchen space shall be re-painted. The colours to be used in this space shall be agreed upon between the contractor and GIZ.
• A wooden false ceiling made with wood rafters will be placed in the dining space.
Room for drivers:
• The room for drivers will be separated from reception area by a gypsum partition up to the ceiling.
• The new gypsum partition shall be painted and existing wall shall be re-painted. The colours to be used in this space shall be agreed upon between the contractor and GIZ.
Server Room:• The server room will be separated from the large meeting room by a gypsum partition up to the ceiling.
• The new gypsum partition shall be painted, and existing wall shall be re-painted. The colours to be used in this space shall be agreed upon between the contractor and GIZ.
Other tasks:Electrical installation
• After an assessment of the existing installation, the contractor shall provide and install additional plugs connected to existing plugs or the electrical board.
• Part of the existing ceiling lights shall be moved so that they fit to the office layout.
• Additional smoke detector shall be installed.
Data network• After an assessment of the existing installation, the contractor shall provide and install additional data plugs connected to the server room.
Air conditioning
• The large meeting room and the server room shall be equipped with a split air conditioning system.
Note:
• The floor tiles of the various spaces will have to be protected during the entire duration of the works. In case of any damage, the contractor will have to replace the floor tiles.
• The contractor is required to check the Bill of Quantities (BoQ) before bidding. If he/she notices any discrepancies with the works to be implemented and/or with the quantities reported in the BoQ, he must indicate this in his offer. Once the bid is submitted, the scope of work and the quantities are considered accepted by the contractor, who cannot contest them or ask for any revision of the quantities during the implementation of the works.
• The contractor will be expected to fill in the costs of each of the items listed in the excel sheet (Bill of Quantities) with clear specifications for each product provided by GIZ upon request and submit it alongside his/her offer.
Process descriptionThe contractor is required to describe the key processes for the services for which he/she is responsible and create a schedule that describes how the services are to be provided.
In particular, the contractor is required to describe the necessary work steps and, if applicable, take account of the milestones and contributions of other actors.
The contractor is required to draw up a personnel assignment plan that includes information on assignment dates (duration and expert days) and locations of his assignment.
C. Contractor qualifications and requested informationThe contractor is required to provide at least five (5) references of similar works showing its capacities to complete the planned project with the required finishing quality.
The specified qualification and information below represent the requirements to reach the maximum number of points. Qualifications:
• Only contractors company is allowed to apply no individual application accepted
• Good business language skills in English, French and Kinyarwanda.
• 5 years of technical experience in a similar area of work in Rwanda with proof
• At least 5 references with proof of similar works
• Provide an RDB Certificate as proof that the company is registered in Rwanda
• Evidence that the company is VAT registered with RRA. (Attach the company’s VAT certificate)
• The contractor shall also be expected to present evidence of tax clearance for the last three months
• The contractor should be willing to allocate at least 5 staff/ from his/her company to fully work on this project. C.Vs of these 5 staff/ should also be attached to the technical offer that will be submitted to GIZ
Timelines for the assignment:• Period of assignment: November 2022 until December 2022.
• Place of assignment: Kigali, Rwanda
ContactIn case of questions regarding the assignment, please contact
procurement-rw@giz.de. Briefing session
Interested applicants should be available for a site visit at the second floor of the Golden Plaza Building on 04.11.2022 from 10AM to 11AM. Only applicants who will be present for the site visit will receive the artwork and the Bill of Quantities (BoQ) for the assignment. (Essential for submission of tender documents).
Submission of offer• Only candidates who attended the briefing session will submit their applications (technical offer & financial offer).
• The Expression of Interest should contain the following:
Technical Proposal:• A cover letter expressing your interest in this assignment
• Technical offer with a brief description of why you would be considered as the most suitable for the assignment, relevant expertise, and a detailed, clear methodology
• Up to date CVs of the technicians
• Company Registration certificate (RDB)
• VAT registration certificate
• Tax clearance certificate
• Proof of successful completion of related assignments.
Financial Proposal: indicates the all-inclusive total contract price, supported by a breakdown of all costs. The costs must be in RWF and VAT
Please submit electronically your EoI (technical & Financial offer) in 2 separated emails and should be in PDF files to this email ONLY:
RW_Quotation@giz.de until latest 11th November 2022
Please you must write on each email subject this sentence: 83418649-Technical/financial offer, without this sentence, your offer may not be considered
Hard copies are not allowed this time
GIZ reserves all rights