REQUEST FOR PROPOSALS (RFP) FOR THE CONSTRUCTION OF SWIMMING POOL CHANGING ROOMS AT THE INTERNATIONAL SCHOOL OF KIGALI
1. Project Title
Construction of Swimming Pool Changing Rooms with a Concrete Slab Roof at the International School of Kigali.
2. Background
The International School of Kigali (ISK), as part of its strategic infrastructure development, is seeking a qualified contractor to design and construct new swimming pool changing rooms. The project aims to provide modern, durable, and eco-friendly facilities that ensure comfort, privacy, and accessibility for students and visitors. The proposed construction should comply with local construction standards and environmental regulations.
3. Project Objectives
With a broader initiative to enhance its physical infrastructure in a sustainable and community-friendly manner, the objective of this project is to construct four separate changing rooms to serve the swimming pool: male and female, subdivided into sections for adults and youth. These facilities should be functional, safe, and aesthetically integrated into the existing infrastructure.
4. Scope of Work
Phase 1 – Site Layout and Preparation
Phase 2 – Interior Finishing and Utility Installations
Phase 3 – Final Inspection and Handover
5. Deliverables
The following minimum deliverables are expected:
Inception Report:
Progress Reports:
Final Construction and Inspection Report:
6. Stakeholders
7. Proposal Requirements
Interested contractors must submit the following documentation:
Technical Proposal:
Financial Proposal:
Attachments:
8. Contract duration and timelines
The project is expected to commence immediately after contract signing, with a completion timeline of six months. The contractor is expected to adhere to the milestones laid out in their technical proposal. Payments will be made in phases, based on the completion of agreed milestones upon submission of progress reports, project deliverables, and successful inspection reports.
9. Remuneration and payment terms
The financial offer must include all relevant costs (including logistics, contingency, labor, and materials). ISK reserves the right to negotiate final prices based on market conditions and the scope of work.
10. How to Apply
Each submission should be divided into two separate password-protected PDF files (Technical and Financial proposals). The password should be sent in a separate email to ensure transparency and confidentiality.
The 1st PDF will contain the technical offer consisting of the following elements:
The 2nd PDF will contain the financial offer composed of the following elements:
The interested and qualified firms are requested to submit two separate password-protected PDF files (Technical Proposal and Financial Proposal) by email only to procurement@iskr.org by Monday, 4th November 2024, at 2:00 PM. Proposals submitted after this time will not be considered.
11. Evaluation Criteria
All proposals will be evaluated based on the following criteria:
N° |
Evaluation Criteria |
Marks |
1 |
Understanding of the Project |
60 |
1.1 |
Site analysis and construction methodology |
30 |
1.2 |
Work plan and timelines |
10 |
1.3 |
Environmental, health, and safety measures |
20 |
2 |
Qualifications and Experience of the Contractor |
40 |
2.1 |
Qualifications of personnel assigned to the project |
20 |
2.2 |
Previous experience with similar projects |
20 |
Total |
100 |
Only firms scoring 70% or more on the technical evaluation will proceed to financial evaluation.
Evaluation of Financial Proposal
Appendix 1- Approved changing room design
Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.